At the Village Board update last Monday evening, the construction timetable was discussed. The Board decided to authorize the construction of the needed access roads onto the site for construction in early 2010. Modifications were made to the wash bay. It will now be detached with the fueling islands located between the bay and the storage building. This construction format will allow for a canopy over the fueling island to shield the public works employees when fueling the vehicles in inclement conditions.
The board also decided to go with a T shaped main building to maximize the usable square footage and allow for maximum future expansion if needed. Building elevation options were discussed.
More information on the looks of the building and bidding packages will be discussed at the October 19 Village Board update at 6 PM.